Diagram # |
Part Number |
|
Description |
Series |
Availability |
Ships |
Price |
Add to Cart | |
2 |
131168200 |
|
Screw, Pan Head, 8-18b X 0.31
|
|
|
Immediately |
$ 14.31 |
|
|
4 |
134792100 |
|
Bracket, Main, Terminal
|
|
|
7 to 14 Days |
$ 27.53 |
|
|
8 |
134694400 |
|
Cover, Terminal Block
|
|
|
7 to 14 Days |
$ 68.53 |
|
|
10 |
5304513567 |
|
Bracket, Front Panel
|
|
|
7 to 14 Days |
$ 30.22 |
|
|
15 |
137031800 |
|
Cushion, Vibration, Top Panel
|
|
|
7 to 14 Days |
$ 9.11 |
|
|
16 |
5304513571 |
|
Duct Assembly, Heat, Rear
|
|
|
7 to 14 Days |
$ 129.66 |
|
|
17 |
134792900 |
|
Protector, Edge, Right Top Front, 85.0+/-1.5
|
|
|
7 to 14 Days |
$ 13.60 |
|
|
18 |
131168200 |
|
Screw, 10-16ab X 0.375 (Replaces: 131477000)
|
|
|
Immediately |
$ 14.31 |
|
|
19 |
5304520302 |
|
Thermistor, Inlet
|
|
|
7 to 14 Days |
$ 47.69 |
|
|
20 |
5304499489 |
|
Seal, Felt, Purple Stitches, Drum
|
|
|
7 to 14 Days |
$ 73.67 |
|
|
21 |
137610710 |
|
Drum, 2 Rib 38
|
|
|
7 to 14 Days |
$ 380.58 |
|
|
24 |
137537100 |
|
Cover, Back Sheet, Cutout
|
|
|
7 to 14 Days |
$ 39.63 |
|
|
26 |
5304529910 |
|
Board Assembly, Main Control, W/housing
|
|
|
7 to 14 Days |
$ 283.95 |
|
|
28 |
137560425 |
|
Panel, Backsheet (Replaces: 137560413)
|
|
|
7 to 14 Days |
$ 201.33 |
|
|
29 |
131205100 |
|
Screw, #8 Pan Head, 10-10b X 0.500, Cr/sq Drive
|
|
|
Immediately |
$ 14.36 |
|
|
30 |
137610600 |
|
Vane, Drum, Straight
|
|
|
7 to 14 Days |
$ 70.54 |
|
|
36 |
5304523154 |
|
Spacer, Drum Roller
|
|
|
7 to 14 Days |
$ 22.94 |
|
|
37 |
137553500 |
|
Cover, Exhaust Tube
|
|
|
7 to 14 Days |
$ 42.97 |
|
|
38 |
5304529714 |
|
Shaft, Drum Roller, Shoulder Bolt
|
|
|
7 to 14 Days |
$ 20.79 |
|
|
40 |
5304523152 |
|
Roller Wheel, Assembly, W/bearing
|
|
|
Immediately |
$ 25.78 |
|
|
41 |
5304523153 |
|
Nut, Lock
|
|
|
7 to 14 Days |
$ 9.85 |
|
|
44 |
134158001 |
|
Leveling Leg, Screw
|
|
|
Immediately |
$ 19.33 |
|
|
45 |
5304521407 |
|
Bulkhead, Panel, Rear
|
|
|
7 to 14 Days |
$ 172.46 |
|
|
50 |
215822000 |
|
Screw, Pan Head, 8-18ab X 0.375 (Replaces: 131243700)
|
|
|
Immediately |
$ 16.00 |
|
|
51 |
5304495002 |
|
Install Kit, Steam Dryer, Optional, Accessory
|
|
|
7 to 14 Days |
$ 61.78 |
|
|
52 |
137573900 |
|
Screw, Comb Pan Hd, 1/4-14x.375
|
|
|
7 to 14 Days |
$ 8.06 |
|
|
61 |
137544800 |
|
Valve, Mist Lowprofile
|
|
|
7 to 14 Days |
$ 75.22 |
|
|
65 |
137017200 |
|
Grommet, Misting Tube
|
|
|
7 to 14 Days |
$ 4.51 |
|
|
66 |
137017300 |
|
Nut, Nozzle
|
|
|
7 to 14 Days |
$ 26.82 |
|
|
68 |
5304521480 |
|
Nozzle Assembly, Mist System, W/tubing-nut
|
|
|
7 to 14 Days |
$ 122.80 |
|
|
27B |
134690203 |
|
Base, Dryer
|
|
|
7 to 14 Days |
$ 242.08 |
|
|
27L |
134712696 |
|
Panel, Left Side, White
|
|
|
7 to 14 Days |
$ 196.90 |
|
|
27R |
134712796 |
|
Panel, Right Side, White
|
|
|
7 to 14 Days |
$ 196.90 |
|
|
28A |
137029801 |
|
Bracket, Reinforcement, Backsheet
|
|
|
7 to 14 Days |
$ 30.92 |
|
|
30A |
137610500 |
|
Vane, Drum, Mixing
|
|
|
7 to 14 Days |
$ 80.51 |
|
|
NI |
131302800 |
|
Screw, 10-16ab X 0.500 (Replaces: 131258400)
|
|
|
7 to 14 Days |
$ 13.60 |
|
|
NI |
5304529787 |
|
Brace, Side Panel
|
|
|
7 to 14 Days |
$ 32.91 |
|
|
NIA |
5308027429 |
|
Adhesive, High Temp
|
|
|
Immediately |
$ 57.10 |
|
|
NIA |
131202300 |
|
Screw, 10-16ab X 0.625
|
|
|
Immediately |
$ 13.60 |
|
|
NIA |
131205500 |
|
Screw, 1/4-14 X 0.625
|
|
|
7 to 14 Days |
$ 13.60 |
|
|
NIA |
5304521493 |
|
Screw, Pn Hd, #10-16 X .375, 7.85mm
|
|
|
7 to 14 Days |
$ 4.95 |
|
|
NIA |
5304529727 |
|
Harness
|
|
|
7 to 14 Days |
$ 164.93 |
|
|
NIB |
137150200 |
|
Terminal Block Kit, Main
|
|
|
7 to 14 Days |
$ 30.22 |
|
|
NIB |
134154100 |
|
Screw, Hex Washer Head, 10-32 X 0.375, Ground
|
|
|
Immediately |
$ 13.62 |
|
|
NIC |
134178901 |
|
Screw, 8-18ab X 0.455
|
|
|
Immediately |
$ 15.03 |
|
|